PATH2 DESIGN PACK v1
====================

Cell:    Twin-line palletising cell
Robot:   KUKA KR 210 R2700 extra (reach 2700 mm, payload 210 kg)
Mode:    Palletising
Date:    2026-11-26
Parts:   24 objects, 6 parts-list lines
IO:      8 PLC inputs, 4 PLC outputs, 16 robot signals, 19 safety IO

CONCEPT LAYOUT - NOT FOR CONSTRUCTION.
Generated by Path2 (https://path2.io) from the cell builder. Check everything
before you order, build or wire anything.

FILES
  layout.pdf        Plan view, A3 landscape, 1:40. Print at 100% / actual size.
  layout.svg        Same drawing as SVG.
  layout.dxf        Same drawing as DXF R12. Cell geometry is 1:1 in mm with
                    the robot A1 axis at 0,0; the border and title block sit
                    around it at 1:40. Layers: OUTLINE, ROBOT, REACH, DIMENSIONS...
  parts_list.xlsx   Parts list (item numbers = balloons on the drawing).
  parts_list.csv    Parts list as CSV.
  io_list.xlsx      PLC IO, robot handshake, safety IO, safety devices,
                    summary.
  io_list.csv       All IO as one CSV (Section column = sheet).
  electrical_components.xlsx  Outline of the control panel and field
                    devices, generated from the IO list.
  electrical_components.csv   Same as CSV.
  drawings/         Roller conveyor, belt conveyor and pedestal drawing sets (PDF, DXF) and 3D
                    models (STEP), one per parts-list item, sized to the
                    cell. Make or buy to these.
  safety_requirements.xlsx  Safety functions with typical PLr, safety
                    distances (ISO 13855), findings and assumptions.
                    Guidance only: needs your risk assessment.
  safety_cause_and_effect.xlsx  Cause and effect matrix: one row per
  safety_cause_and_effect.pdf   e-stop, door interlock and light curtain;
                    what each one does to the robot (stop category),
                    conveyors, gripper and lamps, reset and restart.
                    Also the pallet change step by step as the design
                    works, a design note on zoned pallet change, and the
                    devices the matrix needs that are not in the design.
  validation_fat_sat.xlsx  Test sheets from the IO list: FAT signal check
                    for every IO point, FAT functional tests, SAT safety
                    validation for every safety function (ISO 13849-2,
                    IEC 60204-1, ISO 10218-2), stopping time against the
                    ISO 13855 distances, sign-off blocks.
  fencing_layout.pdf  Fence only, for the fencing company to quote from:
  fencing_layout.dxf  external sizes, openings, doors, standard height.
  cycle_time_and_cost.xlsx  Cycle time per place against the line rate,
                    budget cost range and simple payback, with the
                    assumptions. Estimate: calibrate with one timed cycle.
  business_case.pdf  One page: throughput vs line rate, budget range,
                    payback, assumptions. Budget range, not a quote.
  position_check.xlsx Every program position (place, approach, pick, home,
                    via): reach, A1-A6 against the axis limits, wrist,
                    clashes with the stack and the guarding. OK / Check / Fail.
  position_check.csv  Same as CSV.

CONVENTIONS
  - Units mm and degrees.
  - DATUM A = -X/-Y corner of the robot base (pedestal if fitted). Every
    component is set out in X and Y from DATUM A to a corner: the nearest
    one whose dimension lines run clear of other equipment (the corner
    the drawing shows and the setting-out table lists).
    +X robot forward, +Y robot left, as on the drawing.
  - Reach circle = datasheet maximum reach to the wrist centre. Tool length,
    payload and axis limits are not included.
  - Device tags (CV01, PO01, RB01...) match between drawing and IO list.
  - Safety IO is read from the layout (doors, fence openings). It is a
    starting point: guarding distances, PL and the risk assessment are NOT
    included.

CYCLE TIME AND COST (ESTIMATE. CALIBRATE WITH ONE TIMED CYCLE ON THE ROBOT)
  Cycle time, average: 5.5 s per case
  Cycle time, worst place: 5.7 s
  Where the time goes: PTP there and back 1.5 s, four LIN moves 2.9 s (down
      at 0.7 s each), gripper and settle 1.1 s. The 10% margin is in each
      figure
  Achievable: 10.8 picks/min, 650 cases/hour
  Timed at: Robot at 100%: axes at the datasheet speed with rated payload,
      linear moves at 2 m/s. 10% is then taken off the rate to be safe
      (every time is divided by 0.9)
  As generated: 8.6 picks/min, 6.9 s per case. The program is generated at
      50% axis speed and 0.5 m/s linear moves, the speeds to prove a new
      cell at. Raise them in the program once it is proven
  Pallet: 6 cases, built in 0.6 min
  Pallets per hour: 108.3 building non-stop, 108.3 with 60 s pallet changes
      (2 pallet positions: builds one while another is changed)
  Line rate: Not given. Enter it under Stacking in the builder (cases/min).
  Budget cost: £84,200 to £157,300 (incl. 10% contingency). The low end has
      a used robot, the high end a new one.
  Labour saved: 1 operator(s) x 2 shift(s) x £32,000 = £64,000 a year
  Simple payback: 16 to 29 months
  Budget range for planning, not a quote. Details and assumptions: cycle_time_and_cost.xlsx.

POSITION CHECK
  All 12 positions reachable, inside the joint limits and clear.
  Checked against simplified geometry, not a full simulation. Confirm in KUKA.Sim or on the robot in T1.
  Every position is in position_check.xlsx.